Monday, 12 October 2026Málaga 26°/ 16°Petrol

málagapress

Breaking

Málaga Capital

969 articles

Illustrative image: detail of a cracked concrete wall with exposed steel bars, in a demolition environment.

Demolition of the Ibis Hotel in Málaga to Begin Soon and Last Two Months

The demolition of the Ibis Hotel in Málaga, damaged by a fire in May, will start soon and last about two months. Traffic in the Guimbarda tunnel will be affected.