Monday, 21 September 2026Málaga 28°/ 23°Petrol

málagapress

Breaking

Emabesa

Latest Emabesa news

1 article

Illustrative image: municipal drain on a street with raised grate and accumulated sediment alongside cleaning tools

Benalmádena cleans over 10,300 drains and aims to reach 15,913 by 2026

Benalmádena has cleaned 10,303 drains from January to August as part of an annual campaign aiming for 15,913 by the end of 2026.