Friday, 21 August 2026Málaga 33°/ 24°Petrol

málagapress

Breaking

Guadalhorce River

Latest Guadalhorce River news

2 articles

Close-up of a drainage channel with flowing water, surrounded by grass and reeds, with soft natural light.

Emasa awards €235,000 for the design of a floodable park in the Guadalhorce

Emasa awards TPF Getinsa Euroestudios the project for expanding the Guadalhorce channel and creating a floodable park, with a budget of €235,334.